Beaverton School Distict
PROJECT OVERVIEW
NIS has been working with Beaverton School District for several years. Our first project was an in-depth analysis of the then-current telecommunications infrastructure, which resulted in cable design for 50 sites to include drawings for all locations and written specs for Division 27. NIS provided consulting services for an additional 30 schools in terms of telecommunications infrastructure renovation as needed for a District-wide cabling infrastructure upgrade with additional site improvements. This project included extensive project management and construction administration with mechanical and architectural sub-consultants under NIS. We also drafted and published an invitation to bid for construction services on these 30+ District facilities, including general contractor, electrical, mechanical, and low-voltage. In anticipation of an upcoming data center upgrade NIS worked with a local architect to design the new space, which incorporates all aspects of functionality; from cabinets and racks to the facility entrance and access controls and necessary power sizing..
WHAT PEOPLE SAY:
PAST PROJECTS
Central Valley School District
PROJECT OVERVIEW In the Spring of 2013, Central Valley School District (CVSD) approached NIS to assist them in an infrastructure upgrade to bring all 26 District sites up-to-date with wireless applications. The project began with a District-wide assessment to...
Everett Public Schools
PROJECT OVERVIEW NIS managed procurement and implementation for the District’s 10Gbps Ethernet/IPv4 fiber optics-based infrastructure. We helped design the physical topology, the routing technologies, and the failover components, and were actively involved in managing...
Hillsboro School District
PROJECT OVERVIEW NIS has been engaged in various ways throughout the Hillsboro School District for the last 20 years. We have performed significant design work in all of the District’s facilities and we are the telecom consultant for each new building added to the...
Mukilteo School District
PROJECT OVERVIEW NIS established a relationship with Mukilteo School District in 2006 by performing a data center assessment to evaluate the communications infrastructure including voice, video, data networking, server, and cabling. The assessment was completed using...
Parkrose School District
PROJECT OVERVIEW In 2011, NIS performed a District-wide technology review for the Parkrose School District. The assessment included a review of the District’s cable and infrastructure, LAN and WAN connectivity, wireless connectivity, and Building Automation System...
Sherwood School District
PROJECT OVERVIEW NIS assisted the District in designing and implementing a new VoIP system in 2008. The project began with a discovery and assessment phase, during which NIS reviewed and reported on the existing system; the focus being on the current infrastructure’s...
Silver Falls School District; Silver Falls, OR
PROJECT OVERVIEW When the Silver Falls School District began bond-planning efforts in 2012, they chose NIS to perform an in-depth analysis of their current telecommunications infrastructure to assess their needs and develop technology financial estimates as part of...
Tigard-Tualatin School District
PROJECT OVERVIEW NIS performed a cabling modification project for 16 sites within the Tigard-Tualatin School District in 2011. This project included design and planning, procurement, selection, project management, and quality assurance. Before the project could begin,...
Evergreen Public Schools; Vancouver, WA
PROJECT OVERVIEW NIS is currently engaged with Evergreen Public Schools in Vancouver, Washington, to perform planning, design, procurement, implementation, construction management, and commissioning for a District-wide physical security upgrade that will include IP...
Get in touch today
We would love to hear from you