Lane Community College
PROJECT OVERVIEW
NIS was retained by Lane Community College to perform an exhaustive evaluation of their data center. This evaluation included all aspects of power, HVAC, and space planning. Our report was then used as a base for the design and construction of a new data center. This effort provided the College with a state-of-the-art data center employing Cisco Nexus equipment at the core and utilizing sustainable technology by taking advantage of a closed loop water system to dissipate heat from the data center chiller units. NIS also crafted telecommunications and building infrastructure standards and construction documents and drawings for the College that serve as a foundational block for all campus projects.
WHAT PEOPLE SAY:
PAST PROJECTS
Pacific University; Forest Grove, OR
PROJECT OVERVIEW NIS was retained to assist Pacific University with the technology requirements for several projects including a new library, renovation of the athletic center, and relocation of Old College Hall. As this project progressed, it became apparent that the...
Portland Community College
PROJECT OVERVIEW Portland Community College (PCC) has been a client of NIS for more than 10 years. Our most recent project with the College was a managed migration of their E911 environment in conjunction with an enterprise installation of VoIP services. Previously,...
Seattle Community Colleged District; Seattle, WA
PROJECT OVERVIEW NIS provided a detailed network, voice, and facilities infrastructure assessment that included modifications to the College telecommunications rooms. In addition, network load and traffic analysis and estimated VoIP QoS metrics were evaluated to...
Get in touch today
We would love to hear from you