Pacific University; Forest Grove, OR
PROJECT OVERVIEW
NIS was retained to assist Pacific University with the technology requirements for several projects including a new library, renovation of the athletic center, and relocation of Old College Hall. As this project progressed, it became apparent that the current voice platform could not meet the requirements for the expansion projects.
NIS assessed the University requirements and assisted in the total procurement process for a new system. The needs assessment process unveiled a significant desire and advantage to VoIP applications as well as future campus expansion and renovation plans that would increase the sophistication of applications required in the future. The chosen VoIP system supports over 2,000 stations and resulted in a replacement effort that creatively spans the availability of funding.
Our services included providing design and installation project management services for a wide variety of projects including: structured cabling, an IP based security system, wireless LAN, and an audio visual presentation system. NIS has also been responsible for the review of administrative policies and contract management procedures, and development of a plan for disaster/business continuance for the University.
WHAT PEOPLE SAY:
PAST PROJECTS
Portland Community College
PROJECT OVERVIEW Portland Community College (PCC) has been a client of NIS for more than 10 years. Our most recent project with the College was a managed migration of their E911 environment in conjunction with an enterprise installation of VoIP services. Previously,...
Seattle Community Colleged District; Seattle, WA
PROJECT OVERVIEW NIS provided a detailed network, voice, and facilities infrastructure assessment that included modifications to the College telecommunications rooms. In addition, network load and traffic analysis and estimated VoIP QoS metrics were evaluated to...
Lane Community College
PROJECT OVERVIEW NIS was retained by Lane Community College to perform an exhaustive evaluation of their data center. This evaluation included all aspects of power, HVAC, and space planning. Our report was then used as a base for the design and construction of a new...